Customization: | Available |
---|---|
After-sales Service: | Provide After-Sales Installation and Commissioning |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Sunflower oil processing production line includes almost 4 parts,sunflower seed prepress,sunflower cake extraction,crude sunflower oil refining,and finished sunflower oil filling.
Process of sunflower oil production line:
1.sunflower seeds---cleaning---shelling---shell &nut separating---condition---flaking---cooking ---prepress---filter---pre pressed sunflower oil---oil refining---finished oil filling
2.Pre pressed cake---extraction---miscella steaming & stripping---extracted sunflower oil---degumming---de acidification---decolorizing---deodorizing---de waxing---finished sunflower oil filling
Requirement for the sunflower seed oil processing plant:
Moisture of extraction material |
5-8% |
temperature of extraction material |
50-55°C |
oil content of extraction material |
50-55°C |
oil content of extraction material |
14-18% |
thickness of extraction cake |
less than 13mm |
powder porosity of extraction material |
less than 15% (30 mesh) |
steam |
more than 0.6Mpa |
solvent |
national standard No. 6 solvent oil |
electric powe |
50HZ 3*380V±10% |
Electric lighting |
50HZ 220V ±10% |
tempreture of supplement water |
less than 25°C |
Hardness |
less than 10 |
volume of supplement water |
1-2m/t raw material |
temperature of recycle water |
less than 32°C |
Features of sunflower oil production line:
1. Provide the appropriate production environment
2. Try our best to minimize grease total losses, improve the oil yield , increase production and improve the quality of oil and cake meal;
3. Increase s comprehensive utilization for the impurities and residues;
4. Protectly match oil extraction production line, design different production process according to different raw material.
Packing and shipping
We have our own logistic department from machine packing to shipment.
After machine shipping,we can send our senior engineer to go there for guiding
the installation and commisioning,trainning your workers if you need.